Currently, legal entities – consumers of thermal energy and owners of departmental heat sources in the Lepel district are actively working on preparations for the upcoming heating season.

Currently, legal entities – consumers of thermal energy and owners of departmental heat sources in the Lepel district are actively working on preparations for the upcoming heating season.

Currently, legal entities – consumers of thermal energy and owners of departmental heat sources in the Lepel district are actively working on preparations for the upcoming heating season.

During the preparation, it is necessary to:

- develop a plan of organisational and technical measures for the preparation of heat supply and electricity supply systems for the upcoming heating season;

- carry out scheduled repairs of main and auxiliary thermomechanical equipment in the required volumes;

- perform building and premises insulation work;

- timely perform verification of thermal energy meters, control and measuring instruments; ensure the availability of functional automatic control systems;

- carry out hydraulic tests of heat networks, water heaters, hydraulic tests and flushing of pipelines and equipment of heat points, heating systems, pipelines and heaters of ventilation systems with the issuance of relevant acts;

- overhaul shut-off and control valves;

- restore damaged insulation coatings on pipelines and other equipment of heat consumption systems;

- ensure the reliability of electricity supply;

- place temperature schedules of internal heat consumption systems in the heat points;

- for heat sources with a capacity of 200 kilowatts or more, regardless of the capacity of the installed boilers, it is necessary to obtain a Conclusion from Gosgortekhnadzor regarding their readiness for operation in the heating season.

In addition, when preparing for the heating season, it is necessary to check the compliance of the schemes with the actual condition of all elements of the organisation's heat supply system and ensure the availability of approved schematic diagrams of pipelines and equipment located in the heat points and boiler rooms, with numbering of valves and placement of control and measuring instruments and automation.

In connection with the entry into force of the Technical