From May 15, the Vitebsk Heating Networks branch of RUP Vitebskenergo will commence testing for elevated temperature, heat and hydraulic losses of the heating networks, and will carry out repair and preventive maintenance on the heating networks of the regional centre.
The purpose of the upcoming works is preparation for the autumn-winter period of 2024-2025. In this regard, scheduled hot water outages will begin in Vitebsk.
Phased schedule for hot water outages in Vitebsk
|
Mini-CHPP "Vostochnaya" |
from May 15 to May 27 |
|
Boiler house "Yuzhnaya", Stage I |
from June 3 to June 15 |
|
Vitebsk CHPP |
from July 23 to August 4 |
|
Boiler house "Yuzhnaya", Stage II |
from August 12 to August 24 |
|
Boiler house "Severnaya" |
from August 19 to August 31 |
From May 15 to May 27 – Mini-CHPP "Vostochnaya"
From 09:00 on 15.05.2024 to 23:59 on 27.05.2024, scheduled repair of heating networks from the mini-CHPP "Vostochnaya" will be carried out. In connection with this, hot water supply will be unavailable in residential buildings and other facilities located at the following addresses:
- Suvorova Street;
- Kupala Street;
- Krylova Street;
- Mayakovsky Street;
- Politekhnicheskaya Street;
- Sovetskaya Street;
- Bauman Street;
- Lenina Street, 36, 40, 44/2, 46/1, 48, 50/6, 52/13, 52, 52a, 52b, 53, 54, 55, 55a, 56, 57, 58, 59/11, 60, 61, 62/19, 63, 64, 65, 66, 65a, 67/21, 68, 69, 70, 71, 72, 73/2, 74, 75, 76;
- Tolstoy Street, 1, 3, 5;
- Kotovsky Street, 15, 17, 21, 23;
- 5th Frunze Street, 2, 6, 14;
- 2nd Frunze Street, 4;
- all facilities on Pravdy Street (except buildings No. 13/7, 14/5, 18, and 24);
- Lyudnikova Avenue, 11, 11a, 12, 13, 14, 15, 16, 17;
- Moskovsky Avenue, 66/1, 68, 70, all facilities of the Technological University, 74 building 1, 74 building 2, 74 building 3, 74 building 4, 74 building 5, 74 building 6; 74a, 76, 78, 80, 82, 84, 80a (Kindergarten No. 89), 106;
- Frunze Avenue (except 11, 13a, 13, 13a/1);
- Smolenskaya Street (except railway houses No. 4 building 1, 4 building 2, 4 building 3, 4 building 4, 4 building 5, 4 building 6);
- all properties on Tereshkovoy Street, Krasnoflotskaya Street, Poperechnaya Street, Lugovaya Street, Beresten Street, Lazo Street, Narodnaya Street, Mira Street, Chapaeva Street, 26th of June Street, Dovatora Street, Uritskogo Street, Deputatskaya Street, Putna Street, Kommunisticheskaya Street, Chekhov Street, Kutuzov Street, Kuybyshev Avenue, Griboedov Street, Gorovtsa Street;
- 2nd Sadovaya Street, 6, 8, 10/3, 9, 11, 13, 13a, 15;
- 3rd Sadovaya Street, 10;
- 6th Klinicheskaya Street, 44;
- Klinichesky Lane, 3, 5;
- Aviatsionny Lane, 2;
- industrial facilities on S. Pankova Passage;
- Tullovo Settlement, Tsentralnaya Street, Novosyolov Street, Molodezhnaya Street, Yubileynaya Street, Sadovy Lane;
- "Cheryomushki" Microdistrict;
- "Bilevo" Microdistrict.
From 09:00 on 17.05.2024 to 23:59 on 18.05.2024, hydraulic testing of heating networks at increased pressure will be carried out.
From June 3 to June 15 – "Yuzhnaya" Boiler House, Stage 1
From 09:00 on 03.06.2024 to 23:59 on 15.06.2024, repairs to the heating networks from the "Yuzhnaya" boiler house (Stage 1) will be carried out. In connection with this, hot water supply will be unavailable at the following properties:
- Moskovsky Avenue, 29;
- all properties on V. Internatsionalistov Street;
- all properties on Meditsinskaya Street;
- Gen. Margelov Street, 1;
- Stroiteley Avenue, 1; 1a; 2; 3 building 1, 3 building 2, 3 building 3; 3b; 5 building 1, 5 building 2; 5a (Kindergarten No. 106); 6; 7; 7 building 1, 7 building 2, 7 building 3; 8; 8 building 2; 11; 11a; 15; 23 ("Ice Palace");
- VGMU Clinic;
- "Luchesa" Hotel;
- P. Brovki Street, 15; 15 building 1, 15 building 2, 15 building 3, 15 building 4, 15 building 6; 17 building 1, 17 building 2, 17 building 3, 17 building 4; 19 building 1, 19 building 2, 19 building 3, 19 building 4; 21 building 1, 21 building 2, 21 building 3; 23 building 1, 23 building 2; 25; 39; 37;
- properties of the Oncology Dispensary, Nephrology Building, Regional Hospital, Children's Home, Maternity Hospital No. 2, District Sanitary and Epidemiological Station;
- Pobedy Avenue, 15 building 1, 15 building 4; 17; 17a; 19; 19a (Kindergarten No. 100); 21; 21 building 1, 21 building 2, 21 building 3, 21 building 4, 21 building 5; 23; 23a (Kindergarten No. 102); 23d; 25 building 2, 25 building 3; 25a (Kindergarten No. 103); 27; 27 building 1, 27 building 2; 29; 29 building 2, 29 building 3, 29 building 4, 29 building 5; 29a (Secondary School No. 39); 31; 31 building 1, 31 building 2; 33; 35; 37; 37 building 1; 41; 41 building 1; 43; 43 building 1; 45; 45 building 1; 47; 49; 53; 55; 55 building 1, 55 building 2, 55 building 3, 55 building 4; 57; 57 building 1; 59; 59 building 1, 59 building 2, 59 building 3; 61; 61 building 1, 61 building 2;
- Chkalova Street, 11 building 10, 11 building 11, 11 building 12, 11 building 13; 12; 21; 21 building 1, 21 building 2; 23, 23 building 1, 23 building 2, 23 building 2a (Kindergarten No. 14); 25; 25g; 25a (Kindergarten No. 12); 25 building 1, 25 building 1a, 25 building 2, 25 building 2a, 25 building 3, 25 building 4, 25 building 5, 25 building 6, 25 building 6a, 25 building 7; 27 building 1, 27 building 3; 27; 27b (Kindergarten No. 15); 28 building 1, 28 building 2, 28 building 3, 28 building 4 (Kindergarten No. 97), 28 building 5; 29; 29 building 1, 29 building 2; 30; 30 building 1, 30 building 2, 30 building 3, 30 building 4, 30 building 5; 31; 32; 32 building 1, 32 building 2, 32 building 2a, 32 building 3, 32 building 4, 32 building 5, 32 building 6, 32 building 7 (Gymnasium No. 8); 34; 36; 36 building 1, 36 building 2, 36 building 3; 36a (Kindergarten No. 101); 37 building 1, 37 building 2, 37 building 3; 38; 38 building 1, 38 building 2; 39; 39 building 1, 39 building 2, 39 building 3; 40; 41; 41 building 1, 41 building 2, 41 building 3, 41 building 4; 44; 43 building 1, 43 building 2, 43 building 3, 43 building 4; 43a; 44 building 1; 47; 47 building 1, 47 building 2; 47a (Secondary School No. 45); 48; 49 building 1, 49 building 2, 49 building 3; 50a; 50 building 1, 50 building 2, 50 building 4; 51; 51 building 2; 52; 52 building 1, 52 building 2, 52 building 3; 54 building 1; 56; 56 building 4; 60; 60 building 1; 62; 62 building 1; 64; 64 building 1; 64a (Kindergarten No. 112); 66; 66 building 1;
- Chernyakhovsky Street, 14 building 5 (Secondary School No. 33); 23; 25; 25a (Vetraź Hotel); 27; 27a; 27 building 1; 29; 31 building 5; 32; 31 building 2 block: A, B, C, D; 32 building 1, 32 building 2, 32 building 3; 33; 34a; 34/13; 34; 34v; 34 building 1; 34 building 2, 34 building 3, 34 building 4; 35 building 1; 36; 36 building 1, 36 building 2; 38; 42; 44.
During the period from 9:00 on 03.06.2024 to 23:59 on 04.06.2024, hydraulic testing of heating networks at elevated pressure will be carried out.
From July 23 to August 04 – Vitebsk CHPP
From 9:00 on 23.07.2024 to 23:59 on 04.08.2024, planned repairs to the heating networks from the Vitebsk CHPP will be carried out. In connection with this, hot water supply will be unavailable at the following facilities:
all facilities in the area of the streets: 39th Army, Academician Pavlov, Belinsky, Bebel, Beloborodov, Budyonny, Bumagin, Byadulya, B. Khmelnitsky, 2, 3, 4/16, 5/14 (“Belsoyuzpechat”), 7/13, 10 (Justice Department, Employment Centre), Vostretsov, Vitebskaya, Voykov, Herzen, Gorodokskaya, Gorbachevsky, M. Gorky, Goncharnaya, Gogol, Glinka, Grazhdanskaya, Dobrolyubov, Dimitrov, Evstigneev, Jaurès, Zamkovaya, Zenkovaya, Zolotozgorskaya, Kalinin, Kosmonavtov, Kirov, Koltsov, Komsomolskaya, 5th Kooperativnaya, Krasin, Kondratyev, Lomonosov, Lokomotivnaya, Leonov, K. Marx, Michurin, Myasnikov, Naberezhnaya, Novy Byt, Nekrasov, Oktyabrskaya, Ordzhonikidze, Porokhovaya, Pokrovskaya, Pushkin, Proletarskikh, Pryadilnaya, Repin, Revolyutsionnaya, Rosa Luxemburg, Sotsialisticheskaya, Smetanin, Soviet Army, Sverdlov, per. Stakhanovsky, per. Stroitelny, Ilyinsky, 4th Industrialnaya, Shagal, Shirokaya, Engels, per. Energetikov, ul. 4th Chkalova, Yamskaya, pl. Pobedy, pl. Svobody;
- ul. Lenina, 6, 8, 8a, 10, 12, 14, 16, 16/22, 16/7, 17, 18, 19, 20, 23, 24, 26/2, 26a, 28, 30/21, 32, 33a, 35,
- ul. Leningradskaya, 2, 4, 15, 16, 17, 18, 27, 37, 39;
- ul. Pravdy, 3, 5, 7a, 8a, 18, 18 k.1, 24;
- ul. Titova, 12, 12a, 14, 16, 20, 20a, 20 k.1, 20 k.1a, 22, 24;
- pr-t Chernyakhovskogo, 5, 7, 9, 11, 13, 13a, 14, 14a, 15, 16, 17, 17a, 18, 19, 20, 20 k.3, 22;
- pr-t Frunze, 11, 13a, 13, 13a/1;
- pos. Kirovsky.
Hydraulic testing of heating networks under increased pressure will be carried out from 9:00 on 23.07.2024 to 23:59 on 25.07.2024.
From August 12 to August 24 – "Yuzhnaya" boiler house, Stage 2
From 9:00 on 12.08.2024 to 23:59 on 24.08.2024, repairs to the heating main from the "Yuzhnaya" boiler house (Stage II) will be carried out. In connection with this, hot water supply will be unavailable at the following facilities:
- Moskovsky Ave., 7; 7 Bldg. 2; 8; 8a; 9a; 9b; 9 Bldg. 1, 9 Bldg. 2; 10; 11 Bldg. 1, 11 Bldg. 2, 11 Bldg. 3, 11 Bldg. 4, 11 Bldg. 5; 12; 13 Bldg. 1, 13 Bldg. 2, 13 Bldg. 3, 13 Bldg. 4, 13 Bldg. 5, 13 Bldg. 6 (Kindergarten No. 78); 14; 15; 15a; 16; 17/1; 18; 19 Bldg. 1, 19 Bldg. 2; 19/2 Bldg. 1; 20; 20a; 20b; 21a; 21 Bldg. 2, 21 Bldg. 3, 21 Bldg. 4; 22; 22a (Bathhouse); 23; 24; 25; 26; 26 Bldg. 1; 27; 27 Bldg. 1, 27 Bldg. 2; 28; 28a (Secondary School No. 11); 29 Bldg. 2; 30; 31; 31a; 32; 32a; 33 (University); 34; 35; 35a (Kindergarten No. 96); 36; 36Bldg. 1; 37; 38; 39; 39 Bldg. 1, 39 Bldg. 3; 40; 41; 41a (Gymnasium No. 9); 42; 43; 43a (Polyclinic); 43Bldg. 1; 44; 45; 45a (Secondary School No. 38); 45b; 45 Bldg. 1, 45 Bldg. 2; 46; 47; 47 Bldg. 1, 47 Bldg. 2; 48; 49; 49a; 50; 51a; 51; 52; 53; 54; 55; 56; 57; 57b; 59; 59a; 59b; 58; 60 ("Evroopt"); 62; 62 Bldg. 1; 64; 64a; 66; 86 ("Santa" shop);
- Smolenskaya St., 4, Bldg. 1; 4 Bldg. 2; 4 Bldg. 3; 4 Bldg. 4; 4 Bldg. 5, 4 Bldg. 6;
- Stroiteley Ave., 4; 6; 8 Bldg. 1; 8 Bldg. 3; 10; 12; 12 Bldg. 1; 16, 18a (Kindergarten No. 85); 18 Bldg. 1, 18 Bldg. 2, 18 Bldg. 3, 18 Bldg. 4; 20 Bldg. 1, 20 Bldg. 2, 20 Bldg. 3; 22 Bldg. 1, 22 Bldg. 2, 22 Bldg. 3, 22 Bldg. 4, 22 Bldg. 5, 22 Bldg. 6, 22 Bldg. 7; 24 Bldg. 1, 24 Bldg. 2, 24 Bldg. 3, 24 Bldg. 4, 24 Bldg. 5, 24 Bldg. 5a; 26/13;
- P. Brovki St., 1a (Kindergarten No. 93); 1 Bldg. 1; 3a; 3 Bldg. 1, 3 Bldg. 2; 5a; 5b (Kindergarten No. 2); 5 Bldg. 1; 7 Bldg. 1, 7 Bldg. 2, 7 Bldg. 3, 7 Bldg. 4 (Secondary School No. 12), 7 Bldg. 5; 9 Bldg. 1, 9 Bldg. 2, 9 Bldg. 3; 11a (Kindergarten No. 88); 11 Bldg. 1, 11 Bldg. 2, 11 Bldg. 3; 13a; 15 Bldg. 5, 16a; 16; 17; 17a; 19; 18; 20a; 20; 21; 22; 23; 23a (Secondary School No. 42); 32; 32a; all facilities of OJSC "Vityaz";
- Pobedy Ave., 1; 2; 3; 3a (Kindergarten No. 52); 3b; 3g; 3 Bldg. 1; 3 Bldg. 2; 3 Bldg. 3; 4a (Kindergarten No. 95); 4; 5; 5 Bldg. 1; 5 Bldg. 2; 6; 6 Bldg. 1, 6 Bldg. 2; 7; 7 Bldg. 1; 7 Bldg. 2; 8; 8a; 10; 12;
- Chkalov St., 1; 1/17; 2; 3; 4 Bldg. 2; 5; 6; 7; 7 Bldg. 1; 7 Bldg. 2, 8; 10; 11/14 (Kindergarten No. 84); 12; 14; 14 Bldg. 1; 14 Bldg. 2; 9 Bldg. 1, 9 Bldg. 2, 9 Bldg. 3, 9 Bldg. 4, 9 Bldg. 5, 9 Bldg. 6, 9 Bldg. 7, 9 Bldg. 8, 9 Bldg. 9; 11a; 11 Bldg. 1, 11 Bldg. 1a, 11 Bldg. 2, 11 Bldg. 3, 11 Bldg. 3a (Kindergarten No. 16), 11 Bldg. 4, 11 Bldg. 7, 11 Bldg. 8, 11 Bldg. 9; 13; 14a (Kindergarten No. 18); 14v (Children's Polyclinic); 15; 16; 16 Bldg. 2; 17; 17 Bldg. 1; 17/2; 18; 18 Bldg. 1; 18 Bldg. 2; 18 Bldg. 3; 18a ("Vesta" 139); 19a (Gymnasium No. 5); 19 Bldg. 1, 19 Bldg. 2, 19 Bldg. 3, 19 Bldg. 4; 22 (Secondary School No. 25); 24a (Bowling); 24 Bldg. 1; 24 Bldg. 2; 24 Bldg. 3; 24 Bldg. 4; 24 Bldg. 5; 24 Bldg. 6; 24 Bldg. 7.
- Starobabinovichsky Tract, 2; 4;
- 2nd Prodolnaya St., 3;
- Lenina St., 1/8; 1a; 3; 3a; 3b; 5a; 5/1; 11v; 15/9;
- Ofitserskaya St., 2;
- Chernyakhovsky Ave., 1; 3; 4; 5; 6; 6 Bldg. 1, 6 Bldg. 2, 6 Bldg. 3, 6 Bldg. 4, 6 Bldg. 5, 6 Bldg. 6; 7; 8; 8a; 10; 12; 18a (Kindergarten No. 6); 20 Bldg. 4; 20 Bldg. 5; 20 Bldg. 6; 20 Bldg. 7; 22 Bldg. 2; 22 Bldg. 3; 22 Bldg. 4; 22 Bldg. 5; 22 Bldg. 6; 22 Bldg. 7; 24; 24d; 24 Bldg. 2; 26; 26 Bldg. 1; 26 Bldg. 2; 26 Bldg. 3; 26 Bldg. 4; 26 Bldg. 5;
- Zhestkova St., 7; 8/1; 10a; 11; 11a; 12; 13; 14; 14a; 15; 16; 16a; 17; 18; 18a, 19; 20; 21; 21a; 22; 23; 24; 25;
- Shrader St., 1; 3; 3 Bldg. 1; 6; 7; 8; 10; 12; 14;
- Shubina St., 2; 3; 4; 5/13;
- Khmelnytskogo St., 9; 9a; 11/6; 12; 20; 24; 27a; 29 (Kindergarten No. 36); 30; 31;
- 3rd Kollektivnaya St., 6.
During the period from 9:00 on 12.08.2024 to 23:59 on 13.08.2024, hydraulic tests of heating networks at increased pressure will be carried out.
From August 19 to August 31 – "Severnaya" Boiler House
From 9:00, scheduled maintenance of heating networks from the "Severnaya" boiler house will be carried out. In this regard, hot water supply will be unavailable at the following facilities:
in the area of Gagarin St., Keramzitovaya St., Serov St., Skorina St., Babushkina St., Osipenko St., 7th Surazhskaya St., 3rd Sadovaya St., 24, 26, 30, 2nd Sadovaya St., 2, 4th Sadovaya St., 1st and 2nd Polyarnaya St., 1st Sovkhozny Lane, Lyudnikova Ave., 2 (Secondary School No. 3), 4, 10.
During the period from 9:00 on 20.08.2024 to 23:59 on 21.08.2024, hydraulic tests of heating networks at increased pressure will be carried out.
Owners of heat supply systems are required to carry out major repairs of heating networks, heating nodes, and internal heating systems, including flushing and pressure testing of pipelines.
Heat supply systems without major repairs and preparation of equipment for the 2024-2025 heating period will not be admitted.
During the heating network testing days, pipeline damage may occur, which can lead to significant leaks of network water. For this period, please remove all valuables from basements.
If any damage to the heating networks is detected, please report it immediately by calling 67-04-41, 67-04-14, 67-06-47.
Source: vitebsk-region.gov.by