Friendship with sports enhances vitality, lifts spirits, strengthens physical powers, and contributes to high-performance work. The management of PMK-75 understands this well.
The fundamental reconstruction of a spacious sports hall, located on the second floor of one of the buildings at the production base, is practically complete. We ascend to the second floor via the staircase together with Sergey Grigorovich, the leading engineer of PMK-75.
The interior of the spacious playing area, with its tastefully decorated ceiling, walls, and wooden parquet floor, is impressively striking. The dimensions of the court are sufficient for organising mini-football, basketball, and volleyball matches. The goals for football games are made of thin metal tubes wrapped in soft foam to prevent players from sustaining physical injuries in case of accidental collision. There is a table for table tennis matches.
Metal grilles are installed on the three large windows to protect the glass from damage. Water heating pipes are laid around the perimeter of the room, and cast-iron radiators are installed to ensure warmth and comfort even in winter cold, allowing for physical education and sports competitions.
A variety of sports training equipment for strengthening arm and leg muscles is installed in a separate room, and another room designated for athletes' rest is equipped with wooden wardrobes for storing outerwear and personal belongings of healthy lifestyle enthusiasts.
PMK-75 Director Yevgeny Divin, Chief Power Engineer Vasily Atroshkevich, Site Manager Alexander Brovka, Engineer Alesya Los, Accountant Denis Prudnik, carpenters Alexander Kozhin, Denis Reut, and many other employees of our construction organisation actively engage in physical education and sports.
Nikolay GORBACHEV